Posts Tagged ‘Please’

Is there a way to undo the effects of cracking or reverse engineering? If so, please give feedback.?

I just cracked some kinda software a while ago and was wondering if there was a way to undo and fix it.
I just cracked some kind of music software a while ago and was wondering if there was a way to undo it and fix it.


really need help. if you dont want to help please dont respond?

1. When developers start to acquire equipment or software, the __________ stage of the Systems Development Life Cycle has been reached.
A. development
B. design
C. implementation
D. needs analysis

2. A __________ implementation of software in the Systems Development Life Cycle will involve employees utilizing one part at a time.
A. parallel
B. direct
C. phased
D. pilot

3. Adding new features is typically performed during the __________ phase of the Systems Development Life Cycle.
A. implementation
B. needs analysis
C. development
D. maintenance

4. High intensity and level of commitment required in the first __________ phases of Rapid Application Development are expected to shorten the entire development process.
A. two
B. three
C. five
D. six

5. Senior managers but not end users participate during the __________ sessions for Rapid Application Development.
A. needs analysis
B. joint requirements planning
C. joint applications design
D. object oriented system analysis

6. An analysis of the current system is performed during the __________ phase of Systems Development Life Cycle.
A. development
B. systems design
C. implementation
D. needs analysis

7. In __________, team members start with the big picture and move to the details.
A. top-down design
B. bottom-up design
C. object oriented system analysis
D. rapid application design

8. Many teams use working models called __________ to explore the look and feel of screens with users.
A. demos
B. prototypes
C. objects
D. designs

9. In the needs analysis section of the Systems Development Life Cycle, the __________ typically defines a need for a new system.
A. IT manager
B. system analyst
C. user
D. technical writer

10. What phase of the Systems Development Life Cycle may involve a small group of testers?
A. maintenance
B. needs analysis
C. implementation
D. development

11. During the development phase of Systems Development Life Cycle, __________________________.
A. the project team decides how the solution will work
B. the hardware and software are installed in the user environment
C. programmers create or customize software for the system
D. IS professionals provide ongoing training and support to the system’s users

12. By using ____________, developers can visually describe the events and actions that can occur in an information system.
A. structured English
B. data flow diagrams
C. prototypes
D. decision trees

13. Which of the following is computer software used to develop other computer software quickly and reliably?
A. decision trees
B. prototyping
C. data flow diagrams
D. computer-aided software engineering (CASE) tools

14. During the maintenance phase of Systems Development Life Cycle, __________________________.
A. the project team decides how the solution will work
B. the hardware and software are installed in the user environment
C. programmers create or customize software for the system
D. IS professionals provide ongoing training and support to the system’s users

15. Joint requirements planning and joint applications design both use highly structured ________________for Rapid Application Development.
A. programming
B. objects
C. workshops
D. rules

16. Rapid Application Development (RAD) is unique from the Systems Development Life Cycle during the requirements planning phase because in RAD, an organization may use ___________ to identify high-level, strategic management requirements.
A. joint application design (JAD)
B. rapid construction
C. object-oriented systems analysis OOSA
D. joint requirements planning (JRP)

17. Why is the Rapid Application Development user design phase generally completed faster than the Systems Development Life Cycle systems design phase?
A. JLP workshops require senior management to make decisions about design.
B. JAD workshops allow users and developers to work together in the design phase.
C. SDLC systems design requires the use of CASE tools.
D. RAD user design phase has to be completed in less than a week.

18. When users have specific requirements for output that must contain certain pieces of information, the development team will likely use a ______________.
A. bottom-up design
B. top-down design
C. conversion
D. pilot

19. The Rapid Application Development transition phase is similar to the Systems Development Life Cycle ______________ phase.
A. maintenance
B. systems design
C. development
D. implementation

20. The process of moving from an old system to a new system is called _____________.
A. implementation
B. acquisition
C. conversion
D. systems design

21. Joint application design (JAD) was originally created for use in the development of ______


Please fill out the questionnaire?

Hello. My friends and I are bulding a prototype tank using lego mindstorms. Please select the options you prefer. Your feedback is greatly appreciated.

This prototype tank will fire 5 bullets in a rapid sequence. Once built on a larger scale, its functions will serve a variety of purposes.

1. Which do you prefer?

oA) Use this prototype as a potential tank in the Canadian Military

oB) Use this prototype as a toy to be used in the toy industry

3. How effective would the military tank be on a scale of 1-10?

o1
o2
o3
o4
o5
o6
o7
o8
o9
o10

4. Please indicate 2 factors that would be vital for the military tank to function efficiently:

oSpeed
oAppearance
oManoeuvrability
oSafety system
oFire power
oEasy to repair

5. In what type of combat do you think this military tank would be most effective?

oClose combat
oDemolition (destroy walls/buildings)

6. If this prototype is used in the toy industry, would you buy this toy for your child?

oYes
oNo

7. Would this toy tank be too violent for younger age groups?

oYes
oNo

8. How would you rate this toy tank on a scale of 1-10?

o1
o2
o3
o4
o5
o6
o7
o8
o9
o10

9. Select the features you prefer in the toy tank:

oBattle sound effects for added excitement
oBattery level check
Great replies! Thanks everyone!

Yeah Sorry made a mistake with the numbering.. all the questions are there


computer help please im not familiar at all?

When developers start to acquire equipment or software, the __________ stage of the Systems Development Life Cycle has been reached.
A. development
B. design
C. implementation
D. needs analysis

2. A __________ implementation of software in the Systems Development Life Cycle will involve employees utilizing one part at a time.
A. parallel
B. direct
C. phased
D. pilot

3. Adding new features is typically performed during the __________ phase of the Systems Development Life Cycle.
A. implementation
B. needs analysis
C. development
D. maintenance

4. High intensity and level of commitment required in the first __________ phases of Rapid Application Development are expected to shorten the entire development process.
A. two
B. three
C. five
D. six

5. Senior managers but not end users participate during the __________ sessions for Rapid Application Development.
A. needs analysis
B. joint requirements planning
C. joint applications design
D. object oriented system analysis

6. An analysis of the current system is performed during the __________ phase of Systems Development Life Cycle.
A. development
B. systems design
C. implementation
D. needs analysis

7. In __________, team members start with the big picture and move to the details.
A. top-down design
B. bottom-up design
C. object oriented system analysis
D. rapid application design

8. Many teams use working models called __________ to explore the look and feel of screens with users.
A. demos
B. prototypes
C. objects
D. designs

9. In the needs analysis section of the Systems Development Life Cycle, the __________ typically defines a need for a new system.
A. IT manager
B. system analyst
C. user
D. technical writer

10. What phase of the Systems Development Life Cycle may involve a small group of testers?
A. maintenance
B. needs analysis
C. implementation
D. development

11. During the development phase of Systems Development Life Cycle, __________________________.
A. the project team decides how the solution will work
B. the hardware and software are installed in the user environment
C. programmers create or customize software for the system
D. IS professionals provide ongoing training and support to the system’s users

12. By using ____________, developers can visually describe the events and actions that can occur in an information system.
A. structured English
B. data flow diagrams
C. prototypes
D. decision trees

13. Which of the following is computer software used to develop other computer software quickly and reliably?
A. decision trees
B. prototyping
C. data flow diagrams
D. computer-aided software engineering (CASE) tools

14. During the maintenance phase of Systems Development Life Cycle, __________________________.
A. the project team decides how the solution will work
B. the hardware and software are installed in the user environment
C. programmers create or customize software for the system
D. IS professionals provide ongoing training and support to the system’s users

15. Joint requirements planning and joint applications design both use highly structured ________________for Rapid Application Development.
A. programming
B. objects
C. workshops
D. rules

16. Rapid Application Development (RAD) is unique from the Systems Development Life Cycle during the requirements planning phase because in RAD, an organization may use ___________ to identify high-level, strategic management requirements.
A. joint application design (JAD)
B. rapid construction
C. object-oriented systems analysis OOSA
D. joint requirements planning (JRP)

17. Why is the Rapid Application Development user design phase generally completed faster than the Systems Development Life Cycle systems design phase?
A. JLP workshops require senior management to make decisions about design.
B. JAD workshops allow users and developers to work together in the design phase.
C. SDLC systems design requires the use of CASE tools.
D. RAD user design phase has to be completed in less than a week.

18. When users have specific requirements for output that must contain certain pieces of information, the development team will likely use a ______________.
A. bottom-up design
B. top-down design
C. conversion
D. pilot

19. The Rapid Application Development transition phase is similar to the Systems Development Life Cycle ______________ phase.
A. maintenance
B. systems design
C. development
D. implementation

20. The process of moving from an old system to a new system is called _____________.
A. implementation
B. acquisition
C. conversion
D. systems design

21. Joint application design (JAD) was originally created for use in the development of _________


Fundamentals of Information Systems ….. Help please?

Lists the strengths and challenges of each of the following four system development life cycles.
1. Traditional Systems Development Life Cycle
2. Prototyping
3. Rapid Application Development
4. End-User System Development Life Cycle


read and correct the text below grammatically please:?

————One of the main reasons DTU management is considering to purchase a new Rapid Prototyping solution, is the fact that the Z 310plus printer sets a series of limitations when fabricating prototype objects.

Z 310plus manufactures parts using gypsum like, composite material which contains an acceptable quality when designing a fixed and non functional concept model.
Consequently the property of the mentioned material makes the fabricated parts fragile and not durable enough for creating a functional object where different parts are interacting.

In order to illustrate this remark and compare the quality of the demo object, manufactured by the elected RP printers, a suitable and functional demo object designed using Pro/E.

Design idea for this object is inspired by a mechanism used in fishing reels. This mechanism allows the spool to move up and down in order to collect the fishing line while the handle is spinning only in one direction by the fisherman.
The idea is to create a double threaded screw and nut with a support construction to keep the parts in their places.

We chose to create a trapezoidal thread and use the DIN 103 standard with bolt diameter of 14mm and pitch equal to P= 4 which is shown n the table below.———–


Please Suggest Some Good Books On Rapid Prototyping?

I am a PG student in CAD CAM from india